FG has received the permits needed to begin construction of The Sunshine Project, and site preparation activities are underway for the estimated $9.4 billion industrial complex to be located in St. James Parish, Louisiana. 

All activities on the project property are being implemented in a safe and environmentally protective manner.

Preconstruction activities are outlined below. Timing of activities is subject to change and will be provided as information is available.

  • Soil Testing: Soil sampling on site, including collection of soil samples and lab testing, will help determine the types of foundations needed for the facility design. 
  • Utility Relocation: FG is coordinating with contractors to relocate and improve utilities near Hwy. 18, including AT&T, Cox, Entergy, Eatel (RTC) and St. James Parish potable water lines. 
  • Highway 3127 Widening & Drainage Improvement: Voluntary improvements to Hwy. 3127, including widening the highway to four lanes for the length of the facility, adding several turning lanes, and drainage improvements to help minimize traffic impacts. 
  • Test Pile: Installation and performance of a limited test pile program to collect engineering data and design piling for the project. 
  • Pipeline Project: Florida Gas will remove a pipeline running through the site.